Long Island Rail Road

Long Island Rail Road


LIRR Map


The Long Island Rail Road provides electric and diesel rail service east-west throughout Long Island, New York.
Reporting mark LI
Locale Long Island, New York
Dates of operation 1834–present
(PRR-operated from 1928 to 1949)
Track gauge 4 ft 8 12 in (1,435 mm) Standard gauge
Headquarters Jamaica Railroad Station
Jamaica, NY 11435

The Long Island Rail Road (reporting mark LI) or LIRR is a commuter rail system serving the length of Long Island, New York. It is the busiest commuter railroad in North America, serving about 81.5 million passengers each year.[1] Established in 1834 and having operated continuously since then, it is the oldest US railroad still operating under its original name and charter.[2] There are 124 stations on the LIRR, and more than 700 miles (1,100 km) of track[3] on its two lines to the two forks of the island and eight major branches. Each weekday, the LIRR provides more than 303,000 rides to customers.[4] It is publicly owned by the Metropolitan Transportation Authority, which has styled it MTA Long Island Rail Road. The current LIRR logo combines the circular MTA logo with the text Long Island Rail Road, and appears on the sides of trains.

The LIRR is the only commuter passenger railroad in the United States to operate 24 hours a day, seven days a week, with significant off peak, weekend, and holiday service.

Contents

History

The Long Island Rail Road Company was chartered in 1834 to provide a daily train service between New York and Boston via a ferry connection between its Greenport, New York, terminal on Long Island's North Fork and Stonington, Connecticut. This service was superseded in 1849 by the land route through Connecticut that was to become part of the New York, New Haven and Hartford Railroad. The LIRR refocused its attentions towards serving Long Island itself, in competition with other railroads on the island. In the 1870s railroad president Conrad Poppenhusen and his successor Austin Corbin acquired all the railroads and consolidated them into the LIRR.

For much of its history the LIRR was a money loser, but in 1900 the Pennsylvania Railroad (PRR) bought a controlling interest as part of its plan for direct access to Manhattan which commenced on September 8, 1910. The wealthy PRR subsidized the LIRR during the first half of the new century, allowing much expansion and modernization.

By the end of the Second World War, however, the downturn in the railroad industry and dwindling profits caused the PRR to relinquish the LIRR from its payroll. The bankrupt LIRR went into receivership in 1949. The State of New York, realizing how important the railroad was to the future of Long Island, began to subsidize the railroad gradually throughout the 1950s and 60s. In 1966, New York State bought the railroad's controlling stock from the PRR and put it under the newly formed Metropolitan Commuter Transportation Authority (renamed Metropolitan Transportation Authority in 1968). With MTA subsidies, the LIRR modernized further and grew into the busiest commuter railroad in the United States.

The LIRR is one of the few railroads that has survived as an intact company from its original charter to the present day.[2]

Major stations

The LIRR operates out of three western terminals in Manhattan, Brooklyn, and Queens. Jamaica Station in central Queens is the hub of all railroad activities. Expansion of the system into Grand Central Terminal is anticipated over the next few years. The list of major stations includes:

Passenger lines and services

The Long Island Rail Road system is made up of eleven passenger branches. Two main trunk lines, the Main Line and Montauk Branches, spin off nine smaller branches. For scheduling and advertising purposes some of these branches are further divided into sections such as the case with the Montauk Branch, which is known as the Babylon Branch service in the electrified portion of the line between Jamaica and Babylon, while the diesel service beyond Babylon to Montauk is referred to as the Montauk Branch service. All service, with the exception of the Port Washington Branch, passses through Jamaica; the trackage west of Jamaica (except to Port Washington) is known as the City Terminal Zone. The City Terminal Zone includes portions of the Main Line and Atlantic and Montauk Branches, as well as the Amtrak-owned East River Tunnels to Penn Station. The passenger lines are:

Former branches

The railroad has dropped a number of branches due to lack of ridership over the years. Some of these lines became part of the IND Rockaway Line of the New York City Subway, while others were downgraded to freight branches, and the rest abandoned entirely.

Additional services

In addition to its daily commuter patronage, the LIRR also offers the following services:

Fare structure

Like Metro-North Railroad and New Jersey Transit, the Long Island Rail Road has a fare system that is based on the distance a passenger travels, as opposed to the New York City Subway which has a flat rate throughout the entire system. The railroad is broken up in to eight numbered fare zones. Zone 1 includes all of the city terminals and stations west of Jamaica. Zone 3 includes Jamaica and all stations east of Jamaica within the boundaries of New York City, except Far Rockaway. Zones 4 and 7 include all the stations in Nassau County. Zones 9, 10, 12, and 14 includes all the stations in Suffolk County. Each zone contains many stations, and the same fare applies for travel between any station in the origin zone and any station in the destination zone.

Peak fares are charged during the week on trains that arrive at western terminals between the hours of 6 am and 10 am, and for trains that depart from western terminals between the hours of 4 pm and 8 pm. Any passenger holding an off peak ticket on a peak train is required to pay a step up fee. Passengers have the options of buying tickets from ticket agents or ticket vending machines (TVMs) or on the train from railroad conductors yet will incur an on-board penalty fee for doing so. This fee is waived for senior citizens and disabled passengers and also for passengers who board from stations where there are no ticket offices or TVMs.

There are several types of tickets: one way, round trip, peak, off-peak, AM peak or off-peak senior/citizen disabled, peak child, and off-peak child. On off-peak trains, passengers can buy a family ticket for children who are accompanied by a 18 year old for $0.75 if bought from the station agent or TVM, $1.00 if bought on the train from the conductor. Additionally senior citizen/disabled passengers traveling during the morning peak hours are required to pay the AM peak senior citizen/disabled rate. This rate is not charged during PM peak hours.

Daily commuters can also buy a peak or off-peak ten trip ride, a weekly unlimited or an unlimited monthly pass. Monthly passes are good on any train regardless of the time of day, but are only valid within the fare zones specified on the pass.

On weekends the railroad offers a special reduced-fare CityTicket for those passengers who travel within Zones 1 and 3. City Tickets can only be bought from ticket agents or machines.

During the summer season the railroad offers special summer package ticket deals to places such as Long Beach, Jones Beach, the Hamptons, Montauk, and Greenport. Passengers traveling to the Hamptons and Montauk on the Cannonball also have the option of buying a reserved ticket to sit in one of the train's all-reserved Parlor Cars. However, the LIRR suggests that these tickets be booked in advanced based on limited availability.

Train operations

The LIRR runs relatively isolated from the rest of the national rail system. In only two locations does the railroad connect with other railroad trackage:

West of Harold Interlocking in Sunnyside, Queens LIRR trains enter Amtrak territory (the Northeast Corridor) leading to the East River Tunnels. When this track was owned by the Pennsylvania Railroad, trains of the PRR connected to the LIRR at Penn Station. During the 1920s and 1930s, the PRR and LIRR ran a through train, such as The Sunrise Special which ran from Pittsburgh to Montauk.

In Glendale, Queens the LIRR connects with CSX’s Fremont Secondary, which leads to the Hell Gate Bridge and New England, however, once trains leave the secondary they enter LIRR territory and fall under the guidance of the LIRR Book of Rules.

All movements on the LIRR are under the control of the Movement Bureau in Jamaica, which gives orders to the various train towers that control a specific portion of the railroad. Movements in Amtrak territory are controlled by Penn Station Control Center or PSCC, which is run jointly by the LIRR and Amtrak. The PSCC controls as far east as Harold interlocking which is in the Sunnyside area of Queens. The PSCC replaced several towers. The Jamaica Control Center (new in the third quarter of 2010) controls from there east through the Jamaica terminal by direct control of interlockings. This replaced several towers in Jamaica including Jay and Hall towers at the west and east ends of Jamaica station respectively. East of there, lineside towers control the various switches and signals under the direction of the dispatchers in Jamaica.

Power transmission

The LIRR's electrified lines are exclusively powered by 750 V DC third rail with the contact shoe running along the top of the rail, similar to the New York City Subway and PATH trains. In comparison, Metro-North Railroad uses a combination of under-running third rail on its electrified trackage and overhead catenary wires on the New Haven Line. New Jersey Transit's electrified rail lines are powered by overhead catenary wires.

Equipment

The LIRR currently operates an electric fleet of 836 M7 and 170 M3 electric multiple unit cars. These cars operate in married pairs, meaning each car needs the other one to operate, with each car containing its own engineer's operating compartment. Typical consists range from a minimum of 6 cars to a maximum of 12 cars.

Additionally the railroad uses 134 C3 bilevel rail cars powered by 23 DE30AC diesel-electric locomotives and 22 DM30AC dual-mode locomotives.[10]

Named trains

Despite serving a commuter patronage for the majority of its history, the LIRR did have many named trains some of which offered all first class seating, parlor cars, and full bar service. Many of these trains operated during the early part of the 20th Century, with many being discontinued due to the onset of World War II. Some of these trains were re-established after the war during the 1950s and 1960s as the railroad expanded its east end parlor car service after acquiring luxury coaches and Pullman cars from railroads that were discontinuing their passenger trains. Some of the railroads more notable trains were:

Freight service

The LIRR and other railroads that became part of the system have always had freight service, though this has diminished over the years. The process of shedding freight service accelerated with the acquisition of the railroad by New York State.

In recent years there has been some appreciation of the need for better railroad freight service in New York City and elsewhere on Long Island. Both areas are primarily served by trucking for freight haulage, an irony in a region with the most extensive rail transit service in the Americas as well as the worst traffic conditions. Proposals for a Cross-Harbor Rail Tunnel for freight have languished more than a century.

In May 1997, freight service was franchised on a 20-year term to the New York and Atlantic Railway (NYAR), a short line railroad owned by the Anacostia and Pacific Company.[13] It has its own equipment and crews, but uses the rail facilities of the LIRR. To the east, freight service operates to the ends of the West Hempstead, Port Jefferson branches, to Bridgehampton on the Montauk branch, and to Riverhead on the Mainline. On the western end it provides service on the surviving freight-only tracks of the LIRR: the Bay Ridge and Bushwick branches; the nearly freight-only "Lower Montauk"; and to an interchange connection at Fresh Pond Junction in Queens with the CSX, Canadian Pacific, and Providence and Worcester railroads.

Freight branches

Some non-electrified lines are only used for freight:

Planned service expansions

Besides the long anticipated Eastside Access project, the LIRR has several other planned service expansions such as:

Passenger issues

The LIRR has a long history of rocky relations with its passengers,[14] especially daily commuters.[15] Various commuter advocacy groups have been formed to try to represent those interests, in addition to the state mandated LIRR Commuters Council.

One criticism of the LIRR is that the railroad has not improved service to the "east end" of Long Island as the twin forks continue to grow in popularity as a year round tourist and residential destination. Demand is evidenced by flourishing for-profit bus services such as the Hampton Jitney and the Hampton Luxury Liner and the early formative stages of a new East End Transportation Authority. Local politicians have joined the public outcry for the LIRR to either improve the frequency of east end services, or turn the operation over to a local transportation authority.

Critics claim that the on-time performance (OTP) calculated by the LIRR is manipulated to be artificially high. Because the LIRR does not release any raw timing data nor do they have independent (non-MTA) audits it is impossible to verify this claim, or the accuracy of the current On Time Performance measurement. The "percentage" measure is used by many other US passenger railroads but the criticism over accuracy is specific to the LIRR. As defined by the LIRR, a train is "on time" if it arrives at a station within 5 minutes and 59 seconds of the scheduled time.[16] The criterion was 4 minutes and 59 seconds until the LIRR changed it because of a bug in their computer systems.[17] Critics[18] believe the OTP measure does not reflect what commuters experience on a daily basis. The LIRR publishes the current OTP in a monthly booklet called TrainTalk. TrainTalk was previously known as "Keeping Track."

A more accurate way to measure delays and OTP has been proposed to the LIRR.[19] Called the "Passenger Hours Delayed" index it can measure total person-hours of a specific delay. This would be useful in comparing performance of specific days or incidents, day-to-day (or week-to-week) periods, something the current measure cannot do. This 'PHD' index measure is used by some transportation research organizations and would be more meaningful to commuters. As of July 2009 it has not been adopted. The two methods are not mutually exclusive and could be kept and published simultaneously.

2007 ridership was 86.1 million, up 4.9% over 2006. The all time highest ridership was 91.8 million in 1949.[20]

Law enforcement

The former LIRR Police Department, which was founded in 1863, was absorbed along with the Metro-North Railroad Police to form the Metropolitan Transportation Authority Police (MTA Police) in 1998.

Allegation of pension and disability fraud

A New York Times investigation in 2008 showed that more than 90% of Long Island Rail Road employees who had retired since 2000 were receiving disability payments from the federal Railroad Retirement Board, collectively totalling more than $250,000,000 over 8 years.[21]

As a result, Railroad Retirement Agents from Chicago inspected the Long Island office of the Railroad Retirement Board on September 23, 2008. New York Governor David Paterson issued a statement calling for Congress to conduct a full review of the Board's mission and daily activities. Officials at the Board's headquarters responded to the investigation stating that all Occupational Disability annuities were issued in accordance with applicable laws.[21]

On November 17, 2008, former LIRR pension manager Frederick S. Kreuder was arrested and charged with corruption and official misconduct for assisting railroad employees in filing disability claims in exchange for money while on company pay.[22] However, these charges were all dismissed by Supreme Court Judge Kase on December 11, 2009 on the grounds that the prosecution had misled the Grand Jury in the indictment.[23]

A report produced in September 2009 by the Government Accountability Office stated that five federal agencies which investigated and audited the disability awards found no evidence of fraud or wrongdoing by either the Railroad Retirement Board or the retirees who applied for those awards.[24]

Another series of arrests on Oct 27, 2011 included two doctors and a former union official. [25]

See also

References

  1. ^ Metropolitan Transportation Authority. Consolidated Financial Statements as of and for the Years Ended December 31, 2010, and 2009 Retrieved September 11, 2011.
  2. ^ a b [1] retrieved October 20, 2009
  3. ^ a b c d e About the MTA Long Island Rail Road The passenger railroad totals about 315 route-miles.
  4. ^ Long Island Rail Road statistics
  5. ^ LIRR: Jamaica
  6. ^ MTA LIRR – Employment Opportunities (includes mailing address)
  7. ^ MTA Capital ConstructionEast Side Access
  8. ^ U.S. Department of Transportation, U.S. Transportation Secretary Signs Record $2.6 Billion Agreement to Fund New Tunnel Network To Give Long Island Commuters Direct Access to Grand Central Station, December 18, 2006
  9. ^ Ron Ziel and George H. Foster, Steel Rails to the Sunrise, ©1965
  10. ^ Consultant's assessment of the LIRR, Page 21
  11. ^ LIRR Fisherman's Special (Arrt's Arrchives)
  12. ^ May 1927 Sunrise Special timetable (Arrt's Arrchives)
  13. ^ Steinberg, Carol (January 31, 1999). "Bygone Era's Revival: Hauling Goods by Rail". New York Times. http://www.nytimes.com/1999/01/31/nyregion/bygone-era-s-revival-hauling-goods-by-rail.html. Retrieved September 15, 2009. 
  14. ^ Maloney, Jennifer; Schuster, Karla (January 19, 2007). "The Gap What We Found, Thirty Years of Neglect". Newsday. 
  15. ^ Halbfinger, David M. (July 30, 1999). "The Long Island Rail Road: Busiest, but Far From Best". New York Times. http://www.nytimes.com/1999/07/30/nyregion/commuting-misery-special-report-long-island-rail-road-busiest-but-far-best.html. Retrieved September 15, 2009. 
  16. ^ LIRR, – LIRR OTP
  17. ^ LIRR Commuters Campaign, – LIRR On Time Performance questions
  18. ^ LIRR Commuters Campaign, – LIRR Commuters Campaign
  19. ^ LIRR Commuters Campaign, – New OTP Proposal
  20. ^ "LIRR, AirTrain, Tri-Rail Note Higher Annual or Daily Passenger Counts". Progressive Railroading. February 8, 2008. http://www.progressiverailroading.com/news/article.asp?id=15045. Retrieved September 15, 2009. 
  21. ^ a b Bogdanich, Walt; Wilson, Duff (September 23, 2008). "Agents Raid Office in L.I.R.R. Disability Inquiry". New York Times. http://www.nytimes.com/2008/09/24/nyregion/24lirr.html. Retrieved September 15, 2009. 
  22. ^ Wilson, Duff (November 17, 2008). "Ex-Manager Charged in L.I.R.R. Disability Probe". New York Times. http://www.nytimes.com/2008/11/18/nyregion/18lirr.html. Retrieved September 15, 2009. 
  23. ^ Castillo, Alfonso A. (December 11, 2009). "Judge dismisses most charges against LIRR official". Newsday. http://www.newsday.com/long-island/nassau/judge-dismisses-most-charges-against-lirr-official-1.1649523. Retrieved March 4, 2011. 
  24. ^ Railroad Retirement Board: Review of Commuter Railroad Occupational Disability Claims retrieved October 17, 2009
  25. ^ NBC New York, 2011 Oct 27 11 charged in Massive LIRR Disability Pension Scandal

External links

External videos
LIRR Atlantic Av Viaduct, MTA's LIRR; February 5, 2010; 2:34 YouTube video clip
"Overlook" at LIRR Atlantic Terminal, MTA's LIRR; February 24, 2010; 1:46 YouTube video clip
More About CooCoo for LIRR, MTA's LIRR; April 28, 2010; 1:37 YouTube video clip
LIRR Time Lapse: Penn Station to Long Beach, MTA's LIRR; May 20, 2010; 2-minute YouTube video clip
LIRR Time Lapse: Long Beach to Penn Station, MTA's LIRR; May 20, 2010; 2-minute YouTube video clip
New LIRR Atlantic Terminal Pavilion Opens to the Public, LIRR2010 Page; January 5, 2010; 4:10 YouTube video clip
MTA LIRR Proposed Colonial Road Improvement Project, LIRR2010 Page; March 23, 2011; 6:10 YouTube video clip
The East Side Access Project, MTA Long Island Rail Road (LIRR); February 18, 2010; 6:19 YouTube video clip